Skip to product information
1 of 7

WaveLine® Display 10ft S-Curve

WaveLine® Display 10ft S-Curve

Regular price $1,483.00 CAD
Regular price Sale price $1,483.00 CAD
Sale Sold out
Shipping calculated at checkout.
or 4 interest-free payments of $370.75
with
Afterpay

Order online & submit artwork via email or upload artwork page

why choose deluxe canopy

  • Premium materials & craftsmanship
  • Fast lead time
  • Free shipping & no setup fee
  • Complimentary design service
View full details

WaveLine® Display 10ft S-Curve
WL-G-43S


This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with bungee cord snap together to create the base framework, then slide on the pillowcase-like graphic over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. Single or Double-sided.

Kit Includes

  • (1) 4x3 Frame Curve - 1-1/4" (32mm) cold-drawn anodized aluminum 
  • (1) Travel bag - made from 100% recycled materials
  • (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
    • Single or Double-sided available.Add-on Accessories
  • WLM LED Light
  • WLM Counter
  • WLM Triangular Shelf
  • WLM CA700 Case with Counter Conversion

Specifications

  • Display Size: 2998mm W x 2260mm H(118"W x 88" H )
  • Shipping Size: 350mm W x 315mm D x 815mm H(13.8"W x 12.4"D x 32.1"H)
  • Material: Dye-sublimation Stretch Fabric
  • Carton Weight: 7.2kg,15.9lb
  • Graphic Weight: 3.6kg,7.9lb
  • Warranty: One (1) year on hardware and graphics.

Artwork Templates