Skip to product information
1 of 7

WaveLine® Display 20ft S-Curve

WaveLine® Display 20ft S-Curve

Regular price $2,211.00 CAD
Regular price Sale price $2,211.00 CAD
Sale Sold out
Shipping calculated at checkout.
or 4 interest-free payments of $552.75
with
Afterpay

Order online & submit artwork via email or upload artwork page

why choose deluxe canopy

  • Premium materials & craftsmanship
  • Fast lead time
  • Free shipping & no setup fee
  • Complimentary design service
View full details

WaveLine® Display 20ft S-Curve
WL-G-73S


This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with bungee cord snap together to create the base framework, then slide on the pillowcase-like graphic over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. Single or Double-sided.

Kit Includes

  • (1) 7x3 Frame S-Curve - 1-1/4" (32mm) cold-drawn anodized aluminum 
  • (1) Travel bag - made from 100% recycled materials
  • (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
    • Single or double-sided

Add-on Accessories

  • WLM LED Light
  • WLM Counter
  • WLM Triangular Shelf
  • WLM CA700 Case with Counter Conversion

Specifications

  • Display Size: 5981mm W x 2260mm H (235.5" W x 88" H )
  • Shipping Size: 420mm W x 33.5mm D x 820mm H (16.5" W x 13.2" D x 32.3" H)
  • Material: Dye-sublimation Stretch Fabric
  • Carton Weight: 7.2 kg, 15.9 lb
  • Graphic Weight: 6.2 kg,13.6 lb
  • Warranty: One (1) year on hardware and graphics.

Artwork Templates